I have heard that trenches are necessary for heat pump systems. Is this true?

Yes, these are to accommodate the ground loops. Typically you will need at least two narrow trenches 40 to 50 metres long, 1.8 metres deep and 300 mm wide, 5 metres apart (minimum). The trenches can be curved or straight to suit your plot.

Leave a Reply

You must be logged in to post a comment.